IED baseline reports and report for site closure

The initial report, which is a baseline report, it is a document, which presents the current state of the soil and groundwater at the site, where the operation of the installation begins.

Aerial photo of an industrial site

This is one of the annexes to the integrated permit. It is done at the moment when there are circumstances, that the installation can lead to contamination of soil and groundwater on the premises of the establishment. A baseline report shall also be made for installations, which apply for a modification of their current integrated permit (e.g. extension of a plant). The initial report and its necessity are referred to the Act of 27 April 2001, the Environmental Protection Law (consolidated text: the Journal of Laws of 2016, item 672).

What are baseline and site closure reports and when will you need them?

If you would like to know when the initial report should be executed, and when the final report should be done. For what risk analysis is necessary? You need to do a baseline report. Feel free to contact us, WESSLING Poland will help you to deal with this problem.

In order to learn the details of our offer, please contact our sales department.

Your contact regarding the baseline report (BR)

We will be happy to support you.

Latest news

All news

Europen waste reduction week is coming

18-22, 2019 November WESSLING Polska Sp. Z o. o. invites primary school students to take part in workshop services on segregation and waste reduction.

Find out more

WESSLING analyses groundwater and so makes a contribution to high drinking water quality.

WESSLING Polska - New scope of accreditation

We would like to inform that on 9 July 2019, we received the Accreditation Certificate according to standard: PN-EN ISO / IEC 17025: 2018-02 “General requirements for the competence of testing and calibration laboratories”.

Find out more